Ontario home energy rebates available in 2026.
The main provincial pathway is the Home Renovation Savings program. Eligibility, equipment rules and application timing matter, and the former Canada Greener Homes Grant is closed.
Current Home Renovation Savings incentives
The Home Renovation Savings program lists the following maximum rebates. These are program limits, not guaranteed amounts; confirm eligibility and current terms before purchase.
Swipe the table sideways to compare every column.
| Upgrade | Listed maximum | Assessment path shown |
|---|---|---|
| Heat pumps | Up to $12,000 | No assessment required on the listed single-upgrade path |
| Solar + battery storage | Up to $10,000 | No assessment required on the listed single-upgrade path |
| Insulation | Up to $7,700 | Assessment path; complete two or more eligible upgrades |
| Windows and doors | $100 per rough opening | Assessment path; complete two or more eligible upgrades |
| Heat pump water heater | $500 | Assessment path; complete two or more eligible upgrades |
| Air sealing | Up to $250 | Assessment path; complete two or more eligible upgrades |
| Attic insulation | $1,250 | No assessment required on the listed single-upgrade path |
Some paths require a home energy assessment
The program separates upgrades into pathways. The insulation, windows and doors, heat-pump water-heater and air-sealing pathway requires a home energy assessment and two or more eligible upgrades. Other listed measures, including heat pumps and solar with battery storage, are presented on a no-assessment-required pathway.
Program pages summarize incentives. Confirm eligible equipment, pre-approval or enrolment steps, contractor requirements, deadlines and whether work may begin before approval.
The Canada Greener Homes Grant is closed
Natural Resources Canada states that the Canada Greener Homes Grant is closed. Applications ran from May 2021 to February 2024, and December 31, 2025 was the final day for applicants to upload documents. New planning should not assume that grant remains available.
Use incentives to support the sequence, not define it.
Compare upgrades first, then apply current programs to the appropriate phase.